Planning, Design & Construction Bid Opening Alert Bid opening will be delayed for 24 hours if Campus is under Remote Operations at 8:00 am on day of bid opening. Check campus status at https://mualert.missouri.edu ALERT: New projects will bid through the UMSystem Unity Construct website. Both Projex4 and Unity Construct Advertisement sites are active. For construction projects listed in Unity Construct: https://www.umsystem.edu/ums/fa/facilities/construction-bids Advertisements (Current, Upcoming, and Recent) Request for Qualifications Project Name (Project#) Pre-bid Meeting Date Due Date None at this time. Design/Bid/Build The following is a list of construction projects out for bid. Click for project information. Project Name (Project#) Prebid Meeting Date Bid Open Date No Projects currently out for Bid. Design/Bid/Build Projects for Prequalified Health Care Contractors Click here for a list of the General Contractors that have been prequalified for the following projects: Project Name (Project#) Prebid Meeting Date Bid Open Date No Projects currently out for Bid. Construction Manager at Risk The following is a list of Construction Manager at Risk projects out for bid. Project Name (Project#) Advertisement Date Pre-Bid Meeting Date Bid Due Date None at this time Recently Opened Bids The following is a list of bid projects opened in the last 30 days. Awarded contracts will appear in the "Recently Awarded Contracts" section Project Name (Project #) DateBidOpened Bid Tabulation Memorial Stadium Facilities — Concourse Restroom & Concession Stand Upgrades (CP241935) 11/18/2025 Memorial Stadium — West Bleachers Improvements - Renovations (CP262031) 11/6/2025 Memorial Stadium Facilities — SEZ Recruiting Room Fitout (CP241934) 11/4/2025 Memorial Stadium — Sideline Power Installation (CP262051) 10/28/2025 Recently Awarded Contracts The following is a list of recently awarded construction projects. Project Name (Project #) DateContractAwarded Contract Awarded To Amount Awarded General Site — Champions Drive Substation 69kV Transformer Foundations (CP231546) 10/29/2025 Reinhardt Construction, LLC $799,900.00 Walton Stadium — Track & Soccer Surface Upgrade (CP252172) 10/17/2025 Reinhardt Construction, LLC $5,204,500.00 Projects in Design The following is a list of future construction projects. Project Number, Title, and Scope Est. AdDate Est. BidOpenDate Various Locations - Hatch & Schurz Hall Tuck Pointing (CP252341) Due to moisture infiltration Tower tuck Pointing is needed. Base Estimate & Alternates: 428,562.00 12/01/2025 12/23/2025 Various Locations - Roof Replacement (CP252841) Replace the roofs of the 1923 & 1955 buildings of the Power Plant. Work to include replacing all the wood substrate as an add/alternate to the project. Reference the study project CP242431. Base Estimate & Alternates: 793,619.80 12/01/2025 01/06/2026 MU Research Reactor - Installed Exhaust Ductwork Reconfiguration (CP253041) Reconfigure the installed exhaust ductwork to comply with ANSI standards for Stack Monitor installation. The exhaust ductwork installed during the construction of MURR West did not comply with the requirements of the ANSI standard for the sampling of exhaust. BFO Approval Attached Base Estimate & Alternates: 277,600.00 12/02/2025 12/23/2025 General Site - Electric and Steam Manholes Concrete Repairs (CP253191) Perform concrete structural repairs in electric and steam manholes. Base Estimate & Alternates: 325,000.00 01/08/2026 01/22/2026 Memorial Student Union - Rooftop Duct Replacement (CP252991) Replace failing ductwork initially installed under CP151701 as a manufacturer warranty replacement effort. Base Estimate & Alternates: 180,000.00 03/26/2026 04/16/2026 Jesse Hall - First Floor Renovation (CP243351) Enhance the experience of visitors to campus and Jesse Hall by creating multimedia exhibits focusing on leadership development at Mizzou. These installations will occur in the south vestibule, main lobby, and east/west corridors. A new information desk will be constructed and glass doors will be installed. This is a donor-funded project. Base Estimate & Alternates: 2,100,000.00 04/06/2026 04/21/2026 Disclosure: This list is intended for information purposes only. This is not a complete list, nor is the information provided guaranteed to be correct. Stated dates are subject to change. Design/Bid/Build Projects for Prequalified Health Care Contractors in Design The following is a list of future construction projects. Project Number, Title, and Scope Est. AdDate Est. BidOpenDate No project found. Disclosure: This list is intended for information purposes only. This is not a complete list, nor is the information provided guaranteed to be correct. Stated dates are subject to change. MCA (Master Construction Agreement) Projects in Design The following is a list of projects being made available through Nabholz. If you are interested in any of these projects, please contact Garett Plotts with Nabholz at Garett.plotts@nabholz.com. Project Number, Title, and Scope Est. AdDate Capital Region Medical Center - Replace Cooling Tower (CP262001) Replace existing cooling tower. Base Estimate & Alternates: 250,000.00 11/18/2025 Critical Care Addition - Heat Exchanger Replacement (CP262021) Replace two heat exchangers that serve the Critical Care Addition. Replacement includes relocation. Base Estimate & Alternates: 600,000.00 12/18/2025 Keene Street Medical Center - Pharmacy Renovation (CP252711) Update all items necessary to bring existing pharmacy up to USP 797/800 regulations. Base Estimate & Alternates: 416,570.00 01/06/2026